This scheme is different from the item tender and project tendering.这种方案的招标不同于工程招标和项目招标.Chinese tendering process for steam turbines and turbo generator.了解中国汽轮发电机组市场投标过程.After these study, a Project Tendering Decision Ai...
司钻每班检查水刹车.The drillers check hydraulic brake block often every tour.每次交接班时,司钻一定要交换交接班记录.The Drillers must exchange hand - over notes between each tour.他在这个队当司钻.He works as a driller in this crew....
The Board is scrupulous in its consideration of all applications for licences.委员会对所有申请许可证的人予以审慎考虑。Out of the original 23,000 applications, 16,000 candidates meet the entry requirements.最初的2.3万份申请中有1.6万份满足入选的要求。With repea...